Installation Process Ex. 2


ipe2 (2)
The job started with the removal of the existing vinyl liner pool (top) and removal of the old tennis court.

ipe2 (1)
The walls of the pool are shaped and the floor of the pool is lined with crush stone to aid in water drainage.

ipe2 (3)
The floor is then prepared for plumbing and gunite.

ipe2 (5)
The gunite shell is then shot…

ipe2 (7)
....and smoothed.

ipe2 (4)
After the tile, decking and plaster is done, the slide, diving board, and stairs are added.

ipe2 (6)
The final product!